Posted by:
UK: GE Renewable Energy to Build New Rotor Blade Manufacturing Facility
Official Press Release GE Renewable Energy:
GE Renewable Energy plans to open new offshore wind blade manufacturing plant in Teesside, United Kingdom
LM Wind Power plans to open and operate a brand-new manufacturing plant for the production of offshore wind turbine blades, due to open and start production in 2023 / The manufacturing facility could create 750 direct renewable energy jobs and close to 1,500 indirect jobs in the area / The facility would address the needs of the strong offshore wind market in the UK / The Dogger Bank Offshore Wind Farm, which features GE’s Haliade-X offshore wind platform, would directly benefit from the blades produced
GE Renewable Energy announced today that it plans to open a new blade manufacturing facility in Teesside in the North East of England. LM Wind Power plans to set up and operate this plant which will be dedicated to the production of its... ... More: Official Press Release GE Renewable Energy
- Keywords:
- GE Renewable Energy, UK, offshore, rotor blade, factory, plant, Teesside, Dogger Bank, Haliade-X, turbine, platform, manufacturing facility, Government