Posted by: Windfair Editors
Main Components of Liebherr HLC 150000 Ready for Installation
Official Press Release Liebherr:
First main components of Liebherr HLC 150000 ready for installation on Alfa Lift
Slewing platform and A-frame on their way to the shipyard / Component installation on Alfa Lift will be supervised by Liebherr experts / Heavy Lift Crane HLC 150000 designed to meet current and future challenges in offshore operations
In the afternoon on March 7, 2021, the deck cargo ship “BigLift Barentsz” left the Liebherr site at the port of Rostock with two remarkable, giant crane components ready for installation. The white painted slewing platform, as well as the characteristic A-frame of the upcoming Heavy Lift Crane HLC 150000, are now on their way to being assembled on OHT’s next-generation offshore wind foundation vessel Alfa Lift. With its unique combination of features, the Liebherr HLC series will be a key element for installing current and... ... More: Official Press Release Liebherr
- Keywords:
- Liebherr, crane, offshore, installation vessel, component, Alfa Lift, Rostock, Germany, Baltic Sea, Dogger Bank, slewing platform, A-frame, shipyard