2024-12-22
https://w3.windfair.us/wind-energy/news/34719-antaris-bavaria-mast-grid-small-wind-inland-turbine-braun-windturbinen

Antaris Turbine installed in Bavaria

The Antaris 12 kW has been installed on a 30m high tubular mast in Bavaria.

Official Press Release BRAUN Windturbinen:

The Antaris 12 kW wind turbine on 30m!

Wind Industry Profile of
The Antaris 12 kW wind turbine on 30m!

Here the Antaris 12 kW works on a 30m high tubular mast in Bavaria. These masts are specially manufactured for hilly inland locations, such as in Bavaria. The mast statics and the foundation plan both contain verifiable documents.

The plant works here 3-phase grid parallel with the Smart!wind SW10. Excess energy is dissipated via 2 pcs. 6.0 kW braking resistors each. The following parameters are monitored for system safety: V DC, RPM, wind speed. In addition, the Antaris wind turbine is shut down completely via a "Braking Box" during the switch-off or braking process after reaching 50rpm. This prevents a restart in braking mode, e.g. in the event of a hurricane. The system was installed electrically by the company Elektro Ecker in Landshut; ... More: Official Press Release BRAUN Windturbinen

Keywords:
Antaris, Bavaria, mast, grid, small wind, inland, turbine, Braun Windturbinen







Thematically suitable Windfair.net members in the business directory

  • Newlist_pce-instruments-logo-300dpi
  • Newlist_logo.windfair-us
  • Newlist_logo.drakawind
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024