2024-12-30
https://w3.windfair.us/wind-energy/news/47158-braun-windturbinen-antaris-schweden

News Release from BRAUN Windturbinen GmbH

List_braun_windturbinen_logo

Wind Industry Profile of


New Antaris Turbine in Sweden

The last Antaris wind turbine installed for 2024!

Antaris 5.5 kW (D4.40 m) near Gothenburg with 12 m wooden mast from Innoventum ©BRAUN WindturbinenAntaris 5.5 kW (D4.40 m) near Gothenburg with 12 m wooden mast from Innoventum ©BRAUN Windturbinen

The Antaris 5.5 kW (D4.40 m) was installed here near Gothenburg in Sweden on a 12 m high wooden mast by the company Innoventum.
https://innoventum.se/en/wind-power/dali/
The wind turbine operates 3-phase grid-parallel with the FIMER Trio 5.8.
https://braun-windturbinen.com/produkte/wind-wechselrichter/
As always, the Antaris 5.5 also has the familiar safety parameters installed: PLC wind, V DC monitoring, helicopter function, CK7.5 generator (7.5 kW).

‘Made in Germany’, which is currently becoming increasingly important!

If you have any questions about the project, please contact us, we will be happy to advise you.

 

Source:
BRAUN Windturbinen GmbH
Author:
Rüdiger Braun (Technical Director)
Email:
info@braun-windturbinen.com
Keywords:
BRAUN Windturbinen, Antaris, Schweden



All news from BRAUN Windturbinen GmbH

List_braun_windturbinen_logo

news in archive


Thematically suitable Windfair.net members in the business directory

  • Newlist_braun_windturbinen_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024