2024-04-19
http://w3.windfair.us/wind-energy/news/30930-acciona-australia-wind-farm-construction-storage-battery-turbine-nordex-blades-victoria

ACCIONA Starts Construction of Mortlake South Wind Farm

Image: ACCIONAImage: ACCIONA
ACCIONA Energía has started construction work on its fifth wind farm in Australia

Official Press Release ACCIONA:

ACCIONA starts construction of its fifth wind farm in Australia

Wind Industry Profile of
ACCIONA starts construction of its fifth wind farm in Australia

With 157.5 MW, Mortlake South in Victoria will increase the company's installed capacity in the country by 36% / A capital investment of 180 million euros, the new facility will be equipped with 4.5 MW Nordex wind turbines

ACCIONA Energía has started construction work on its fifth wind farm in Australia, 100% owned by the company, with an investment of around AUD 288 million (180 million euros at the current exchange rate). The Mortlake South Wind Farm, located in the State of Victoria, will have a capacity of 157.5 megawatts (MW) and be equipped with Nordex technology 4.5 MW turbines. It will represent a 36% rise in the company's wind power capacity in Australia, reaching 592 MW. The sod-turning ceremony held today at Mortlake South recognised the start of... ... More: Official Press Release ACCIONA

Keywords:
ACCIONA, Australia, wind farm, construction, storage, battery, turbine, Nordex, blades, Victoria







Thematically suitable Windfair.net members in the business directory

  • Newlist_kaeufer_logo
  • Newlist_logo.drakawind
  • Newlist_logo.windfair-us

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024