Posted by: Windfair Editors
Strong position for Nordex in Turkey
Official Press Release Nordex:
Nordex receives order for ten N131/3900 turbines from Turkey
Erdem Holding A.S. has placed another order with Nordex to deliver and install a wind farm. The manufacturer is to supply ten N131/3900 turbines for the "Eber" wind farm. A Premium Service covering at least 15 years also forms part of the deal.
The "Eber" site is located 250 kilometres to the south-west of Ankara, near to the city of Afyonkarahisar in western Anatolia. At this altitude the average annual wind speed is 7.8 m/s. The N131/3900 is especially designed for sites with medium to low average wind speeds. Nordex will be supplying the turbines on 84 metre tubular steel towers. Installation is scheduled for spring 2018. Then from the end of 2018 the 39 MW wind farm is to produce 136,000 MWh of clean electricity. "Eber“ is now the fourth wind... ... More: Official Press Release Nordex
- Keywords:
- Nordex, Turkey, wind farm, tubular steel tower