Wind Energy Keyword: "Rügen"
Latest Wind Energy News
-
EMS Maritime Offshore GmbH puts the servicebase in Port Mukran into operation – Base port for tenants Parkwind and Vestas 06/26/2023 -
Fraunhofer IWES: Successful measuring campaign for 50Hertz in the Baltic Sea 11/23/2022 -
5-year service contract for Parkwind on Arcadis Ost 1 07/05/2022 -
Arcadis Ost Offshore Substation installed 06/16/2022 -
Pre-assembly works set to kick off for Arcadis Ost at Rønne Havn 06/01/2022 -
Storage and shipping of foundations for Arcadis Ost 1 will be done from Port of Roenne A/S 01/27/2022 -
Iberdrola signs land lease agreement for Baltic Eagle operations building 09/01/2021 -
Vestas wins offshore order for Arcadis Ost 1, which will utilise industry-first floating installation method 06/24/2021 -
Iberdrola and 50Hertz agree on construction of Baltic Sea offshore substation 05/18/2021 -
MPT handles first tower segments for Arkona offshore wind farm 04/20/2018 - >> more results