2024-12-22
https://w3.windfair.us/wind-energy/news/37984-vestas-arcadis-ost-1-parkwind-vessel-installation-floating-crane-baltic-sea-germany-dual-offshore-wind-farm-turbine

Vestas wins German offshore order - and announces industry-first floating installation method

The V174-9.5 MW turbines will be installed using a new floating installation method, an industry-first, instead of the typical method using a jack-up vessel.

Official Press Release Vestas:

Vestas wins offshore order for Arcadis Ost 1, which will utilise industry-first floating installation method

Wind Industry Profile of
Vestas wins offshore order for Arcadis Ost 1, which will utilise industry-first floating installation method

Vestas has secured a firm order for the 257 MW Arcadis Ost 1 offshore wind project from Parkwind, to deliver 27 V174-9.5 MW turbines 19 km north east off the coast of the Island of Rügen, in the German Baltic Sea.

The order confirms the fifth collaboration between Vestas (previously through MHI Vestas Offshore Wind) and Parkwind on offshore wind projects, and the first outside Belgium. The V174-9.5 MW turbines will be installed using a new floating installation method, an industry-first, instead of the typical method using a jack-up vessel. In collaboration with Parkwind and the vessel operator, Heerema Marine Contractors, a dual crane vessel will be used which enables the floating installation method, involving dynamic lifting and installation of all turbine... ... More: Official Press Release Vestas

Keywords:
Vestas, Arcadis Ost 1, Parkwind, vessel, installation, floating, crane, Baltic Sea, Germany, dual, offshore, wind farm, turbine







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_kaeufer_logo
  • Newlist_logo.drakawind
  • Newlist_logo.windfair-us

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024