2024-12-25
https://w3.windfair.us/wind-energy/news/6007-first-round-2-turbine-goes-up-at-gunfleet-sands

FIRST ROUND 2 TURBINE GOES UP AT GUNFLEET SANDS

STATOILHYDRO/STATKRAFT PLACE ORDER FOR 88 WIND TURBINES FOR SHERINGHAM SHOAL

BWEA can report that DONG Energy has installed this morning UK's first Round 2 turbine in the Tha- mes Estuary as part of the Gunfleet Sands Offshore Wind Farm. The project will have a capacity of 172 MW using 48 turbines at 3.6 MW each, and is due for completion by 2010.

Also today, StatoilHydro and Statkraft have announced that they are joining forces to develop the 315 MW Round 2 Sheringham Shoal project off the coast of Norfolk, and have sealed the alliance with an order for 88 turbines. The project is scheduled to start production in 2011.

More information here

http://www.statoilhydro.com/en/NewsAndMedia/News/2009/Pages/1AprSheringh am.aspx
and here
http://www.dongenergy.com/EN/Media/Press+releases/details.htm?id=418151
Source:
British Wind Energy Association BWEA
Author:
Nick Medic







Keyword Search

© smart dolphin Gmbh 1999 - 2024