2025-01-17
https://w3.windfair.us/wind-energy/news/47217-pne-looks-back-on-a-successful-operating-year-2024

News Release from PNE AG

List_fin_logo_pne_rgb

Wind Industry Profile of


PNE looks back on a successful operating year 2024

+++ Total wind farms and PV projects with 751 MW capacity sold +++ Wind farms with 412 MW capacity in own operation +++

© PNE AG© PNE AG

Cuxhaven (renewablepress) - PNE AG has successfully completed the 2024 operating year. The sale of the Lütau wind farm rounds off a very good 2024 sales year for the PNE Group. In total, PNE sold six wind energy and photovoltaic (PV) projects with a total output of 751.3 MW/MWp in Germany and on the international markets last year. In the first half of 2024, the PNE Group sold the Buffalo Gap wind energy project in Canada with a capacity of 210 MW and the Coronach Muskwa Northwest PV project with 100 MW as well as the Khauta PV project in South Africa with 240 MWp. This was followed in the second half of the year by the Scottish wind farm Sallachy with 43 MW, the repowering project Windpark Nordleda in Germany with 10.4 MW, the PV project Bonsmara in South Africa with 60 MWp, the repowering project Windpark Papenrode with 59.4 MW and the alreforementioned wind farm Lütau with 28.5 MW.

‘We are very satisfied with the sales results for 2024. We were able to sustainably demonstrate our professionalism in our core business, the development of wind energy and PV projects,’ says Roland Stanze, Chief Operating Officer (COO) of PNE AG. ‘The various stages of the projects we are selling emphasise our flexibility. We are also very optimistic for 2025.’

The expansion of PNE AG's own generation portfolio also continued in 2024. With the commissioning of the Heitzelberg (5.5 MW), Schenklengsfeld (19.8 MW) and Heidmoor (36.0 MW) wind farms, the capacity of the wind farms in own operation has grown to 412.0 MW. A further 13 wind farms with an output of 288.6 MW are under construction in Germany and France. PNE decides on a project-by-project basis which of the projects under construction will be transferred to own operation.

In the Services segment, the number of wind power turbines in the area of technical inspections has grown to 1,000.

PNE AG will publish the business figures for 2024 on 27 March 2025.

 

 

Source:
PNE AG
Author:
Alexander Lennemann - Head of Corporate Communications
Email:
Alexander.Lennemann@pne-ag.com
Keywords:
PNE, Wind farm, capacity sold, Windpark



All news from PNE AG

List_fin_logo_pne_rgb

news in archive


Thematically suitable Windfair.net members in the business directory

  • Newlist_fin_logo_pne_rgb
  • Newlist_wkn_gmbh_neu
  • Newlist_eno_energy_ogo_claim
  • Newlist_logo.overspeed
  • Newlist_anemos_logo_neu
  • Newlist_juwi_logo_mit_verlauf_digital_srgb
  • Newlist_hailo_wind_systems_logo_alternativ_grau
  • Newlist_logo.teut
  • Newlist_logo.argentinaeolica.org
  • Newlist_logo_aboenergy
  • Newlist_logo.engr.wisc
  • Newlist_geonet_logo
  • Newlist_wpd-logo
  • Newlist_windrad_logo-1-rgb
  • Newlist_prysmian_logo_rgb
  • Newlist_dynamica_ropes_logo_600x200
  • Newlist_ts_logo_rgb
  • Newlist_umweltbank_logo-2024-claim_mit-schutzzone
  • Newlist_logo.august-friedberg
  • Newlist_energiequelle_logo
  • Newlist_logo.labkotec

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2025