Posted by: Windfair Editors
Vestas wins its largest onshore order so far
Official Press Release Vestas:
Vestas secures 1.3 GW order with Casa dos Ventos in Brazil, the largest onshore order to date for Vestas
With reference to Company Announcement no. 07/2023 of 30 March 2023, Vestas has signed an agreement with Casa dos Ventos for two projects in Brazil: Serra do Tigre wind park in the state of Rio Grande do Norte, and Babilônia Centro in the state of Bahia. The projects have a total capacity of 1.3 GW once fully installed, making it the largest onshore order to date for Vestas in Latin America and globally.
The firm order includes the supply, installation, operation and maintenance of 168 V150-4.5 MW turbines for the 756 MW Serra do Tigre project and 123 V150-4.5 MW turbines for the 554 MW Babilônia Centro project. Vestas will also deliver a 25-year Active Output Management 5000 (AOM 5000) service agreement. This agreement will optimise energy production while also providing... ... More: Official Press Release Vestas
- Keywords:
- Vestas, Brazil, onshore, GW, wind farm, order installation, South America, operation, service, maintenance, Latin America