News Release from BRAUN Windturbinen GmbH
Wind Industry Profile of
01/20/2023
A Happy New Year and good health for 2023 to our current and future customers and everyone else of course!
The system currently operates with a set 1.5 kW on the house grid, above which the 6.0 kW heating rod is switched on. The wind speed is monitored via the wind sensor on the mast.
Excess power is processed via the 6.0 kW braking resistor. In the yield overview, the blue bars stand for grid-parallel operation, the red ones for heating operation.
If you have any questions about the project, please contact us, we will be happy to advise you.
Enjoy the wind with Antaris wind turbines!
- Source:
- BRAUN Windturbinen
- Author:
- Press Office
- Link:
- www.braun-windturbinen.com/...
- Keywords:
- Braun Windturbinen, Lower Saxony, Germany, erection, installation, small wind, turbine, yield