2024-12-22
https://w3.windfair.us/wind-energy/news/41789-prysmian-energy-transition-power-grids-hvdc-cables-test-extruded-trasnmission-capacity-efficient-cost-effective

Prysmian successfully tests first 525 kV HVDC extruded submarine cable system

This achievement will put Prysmian Group in a unique position to support the forthcoming tenders for submarine interconnectors aimed at granting efficiency, flexibility and reliability of power grids.

Official Press Release Prysmian Group:

Prysmian reaches key milestone in the field of Power Grids for the Energy Transition

Wind Industry Profile of
Prysmian reaches key milestone in the field of Power Grids for the Energy Transition

First 525 kV HVDC extruded submarine cable system successfully developed and tested / The new technology allows doubling transmission capacity up to more than 2.5 GW for more efficient and cost-effective power transmission

Prysmian Group has reached a key technology milestone in the field of Power Transmission, thus confirming its preminent role and commitment to support the energy transition. The world leader in the cable industry announces the successful development and testing of the first 525 kV extruded submarine full cable system for High Voltage Direct Current (HVDC) applications. This breakthrough innovation in cable technology will enable a massive increase of the maximum transmission capacity of bi-pole systems up to more than 2.5 GW, which is more than... ... More: Official Press Release Prysmian Group

Keywords:
Prysmian, energy transition, power grids, HVDC, cables, test, extruded, trasnmission capacity, efficient, cost effective







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind
  • Newlist_kaeufer_logo
  • Newlist_pce-instruments-logo-300dpi
  • Newlist_logo.windfair-us

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024