2024-11-22
http://w3.windfair.us/wind-energy/news/39510-jan-de-nul-vessel-off-shore-wind-farm-installation-logistics-transport-les-alizes-floating-next-generation-commissioning-crane

Jan De Nul introduces its Next Generation Offshore Wind Installation Vessel Les Alizés

Jan De Nul launched its Offshore Installation Vessel Les Alizés at the CMHI Haimen shipyard in China, reaching ianother milestione in the construction of the vessel.

Official Press Release Jan De Nul:

Jan De Nul launched its Next Generation Offshore Wind Installation Vessel Les Alizés

Wind Industry Profile of
Jan De Nul launched its Next Generation Offshore Wind Installation Vessel Les Alizés

An important milestone is reached in the construction of Les Alizés, a Next-Gen floating offshore installation vessel for offshore renewables and decommissioning. Jan De Nul launched its Offshore Installation Vessel Les Alizés at the CMHI Haimen shipyard in China.

This vessel will be the largest Heavy Lift Vessel in Jan De Nul’s fleet, able to install XXL offshore wind components, in floating conditions and with ultra-low emissions. The launch started on 2nd January by flooding the dry dock in which Les Alizés was built. Once afloat, Les Alizés was moored alongside the adjacent quay wall. Yesterday, the official launching ceremony took place at the CMHI Haimen shipyard, in the presence of the shipyard management and Jan De Nul Group... ... More: Official Press Release Jan De Nul

Keywords:
Jan De Nul, vessel, off shore, wind farm, installation, logistics, transport, Les Alizés, floating, next generation, commissioning, crane







Related News

Thematically suitable Windfair.net members in the business directory


more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024