Posted by: Windfair Editors
VENSYS wins repowering order in France
Official Press Release VENSYS / RES:
New repowering project awarded to VENSYS in France
VENSYS Energy AG and RES S.A.S have signed a contract for the delivery of 16 gearless wind turbines Vensys62 with 1.5MW rated power and 49m hub height in the south of France.
RES is to repower its 20.8 MW Souleilla-Corbières wind farm (16 x Siemens 1.3 MW turbines), in the Aude region, initially commissioned in 2001 and the first wind farm built by RES in France, with a new total installed capacity of 24 MW. The repowered wind farm is scheduled to be operational during 4th quarter of 2023. As this project is very complex with high wind and strong turbulence, VENSYS used its R&D expertise, strongly supported by RES knowledge of the site, to design a new turbine suitable for the site conditions. This is a big step towards VENSYS’... ... More: Official Press Release VENSYS / RES
- Keywords:
- VENSYS, France, RES, repowering, turbine, wind farm, onshore, capacity, Aude, high wind, turbulence, portfolio, service, maintenance