2024-11-22
http://w3.windfair.us/wind-energy/news/37964-lm-wind-power-ge-renewable-energy-rotor-blade-facility-factory-bergama-turkey-emerging-market-plant-wind-power-turbine-capacity

LM Wind Power's Bergama factory celebrates 1111th wind turbine blade

LM Wind Power’s Bergama factory has produced its 1111th wind turbine blade, four years after production activities started at the plant.

Official Press Release LM Wind Power:

Bergama site produces the 1111th wind turbine blade!

Wind Industry Profile of
Bergama site produces the 1111th wind turbine blade!

On June 22nd, it was announced that our wind turbine blade manufacturing site in Bergama, ?zmir, has produced the 1111th wind turbine blade, four years after production activities started at the plant. Devoted to respond to the growing demand for wind energy worldwide, including in Turkey, Europe and Asia these 1111 blades are meant to capture the wind for a total capacity of about 1.58 GW.

Inaugurated in July 2017, the Bergama facility became the fifteenth LM Wind Power factory and the first opened after the company became a GE Renewable Energy business. The Bergama factory represents a $80 million investment to Turkey. The construction of the site’s extension started at the end of April 2019, in order to set-up the factory to produce the innovative two-pieces... ... More: Official Press Release LM Wind Power

Keywords:
LM Wind Power, GE Renewable Energy, rotor blade, facility, factory, Bergama, Turkey, emerging market, plant, wind power, turbine, capacity







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_kaeufer_logo
  • Newlist_logo.windfair-us
  • Newlist_logo.drakawind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024