2024-11-22
http://w3.windfair.us/wind-energy/news/33107-vestas-new-zealand-mercury-turbine-installation-turitea-onshore-wind-farm-tower-design-footprint

Vestas to Supply New Zealand's Largest Wind Farm

Vestas secures an order for the 103 MW addition to complete New Zealand’s largest wind farm

Official Press Release Vestas:

Vestas secures 103 MW addition to EPC project with Mercury to complete New Zealand’s largest wind farm

Wind Industry Profile of
 Vestas secures 103 MW addition to EPC project with Mercury to complete New Zealand’s largest wind farm

Vestas has signed a 103 MW engineering, procurement and construction contract with New Zealand-based electricity generator and retailer Mercury. The deal will extend Mercury’s Turitea Wind Farm from 119 MW to 222 MW, improving the cost of energy and making Mercury’s first wind project the largest wind park in New Zealand.

Situated near Palmerston North, the wind farm will now feature a further 27 Vestas V112-3.45 MW turbines delivered in 3.8 MW Power Optimised Mode, alongside the initial 33 Vestas V112-3.35 MW turbines operating in 3.6 MW. The turbines’ optimised power rating and site-specific tower design have been selected to maximise the energy generation at the new part of the wind park. “We are pleased to be able to complete this project with Vestas... ... More: Official Press Release Vestas

Keywords:
Vestas, New Zealand, Mercury, turbine, installation, Turitea, onshore, wind farm, tower design, footprint







Thematically suitable Windfair.net members in the business directory

  • Newlist_kaeufer_logo
  • Newlist_logo.drakawind
  • Newlist_logo.windfair-us

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024