2024-12-23
https://w3.windfair.us/wind-energy/news/30031-innogy-poland-auction-success-wind-farm-utility-germany-onshore

News Release from windfair.net

List_windfair_logo_pos

Wind Industry Profile of


Double Success for innogy

At the first Polish onshore wind auction, the German energy utility was successful with two projects.

The onshore wind farm Zukowice is a 33 MW project in Lower Silesia, the Dolice project with a planned installed capacity of 52.2 MW is located in Western Pomerania.

Hans Bünting, Chief Operating Officer Renewables at innogy SE, was very satiesfied: “We already operate eight onshore wind farms in Poland and want to further expand our portfolio there. We are very pleased that both of our projects, Zukowice and Dolice, were successful in Poland’s first onshore wind auction. The market was yearning for the first auction to take place. This was an important step towards sustainable investment fostering Poland´s Energy Transition."

Author:
Windfair Staff
Email:
press@windfair.net
Keywords:
innogy, Poland, auction, success, wind farm, utility, Germany, onshore



All news from windfair.net

List_windfair_logo_pos

news in archive


Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_ge_vernova_standard_rgb_evergreen
  • Newlist_logo.enervest
  • Newlist_umweltbank_logo-2024-claim_mit-schutzzone
  • Newlist_fin_logo_pne_rgb
  • Newlist_eno_energy_ogo_claim
  • Newlist_energyconsult_lifecycleservices_logo
  • Newlist_bwts_logo_2021
  • Newlist_rts_wind_ag_logo_652x312px
  • Newlist_windrad_logo-1-rgb
  • Newlist_wpd-logo
  • Newlist_logo.helukabel
  • Newlist_peikko_logo
  • Newlist_logo.overspeed
  • Newlist_logo.leitwind
  • Newlist_anemos_logo_neu
  • Newlist_logo.tuev-sued-offshore
  • Newlist_prysmian_logo_rgb
  • Newlist_radolid_logo
  • Newlist_bmu_logo
  • Newlist_sabowind_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024