2024-11-05
http://w3.windfair.us/wind-energy/news/28487-mmt-seabed-survey-aquind-interconnector-corridor

No Obstacles for AQUIND Interconnector

MMT completes geophysical seabed survey for planned AQUIND Interconnector between the UK and France

Official Press Release MMT:

MMT completes geophysical seabed survey for AQUIND Interconnector

MMT has recently completed a geophysical seabed survey and delivered the final report for the proposed AQUIND Interconnector offshore cable route.

MMT surveyed a corridor between Portsmouth in the UK and the coastal region of Dieppe in France. MMT utilised two vessels: M/V Franklin for offshore works and M/V Seabeam for nearshore works. Four cables, bundled as two pairs, will be installed along the surveyed route totalling approximately 190km in length. No major obstacles to the cable route were uncovered during the survey. The survey results will inform Environmental Impact Assessments in both countries and will be further refined during the geotechnical survey campaign. AQUIND and its advisors are keeping all stakeholders in both countries informed of the... ... More: Official Press Release MMT

Keywords:
MMT, seabed survey, AQUIND, interconnector, corridor







Thematically suitable Windfair.net members in the business directory


more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024