2024-12-22
https://w3.windfair.us/wind-energy/news/26224-triton-knoll-offshore-locals-iec-technology

Technology advances: Triton Knoll removes planned IEC

There will be no Intermediate Electrical Compound (IEC) for Triton Knoll Offshore Wind Farm

Official Press Release Triton Knoll:

Technology advances enable Triton Knoll to remove Intermediate Electrical Compound from final design

Use of latest power flow management techniques will further minimise costs at wind farm / Removal of the Intermediate Electrical Compound is welcomed by Orby Parish Council

The team behind the Triton Knoll Offshore Wind Farm have confirmed that they have been able to remove the Intermediate Electrical Compound (IEC) from their final design. The IEC, which was originally planned to be built near Orby in Lincolnshire, would have had a footprint of around 1.8 hectares and was considered necessary to manage power flows along one of the longest, high voltage, underground cable routes in the world. But based on technical modelling and subsequent collaboration between the project team and contractors, the IEC has now been designed out of the electrical system altogether and... ... More: Official Press Release Triton Knoll

Keywords:
Triton Knoll, offshore, locals, IEC, technology







Thematically suitable Windfair.net members in the business directory

  • Newlist_pce-instruments-logo-300dpi

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024