2024-11-05
http://w3.windfair.us/wind-energy/news/25770-turbine-yield-performance-nordex-onshore

Nordex N131/3300: good performance in twelve months of operation

High yield, low sound emission

Official Press Release Nordex:

N131/3300: Twelve months of operation confirm the projected high yield at sites with light winds

Wind Industry Profile of
N131/3300: Twelve months of operation confirm the projected high yield at sites with light winds

One year ago the Nordex Group installed a N131/3300 turbine with a hub height of 164 metres at the "Hausbay-Bickenbach" site in the Rhineland-Palatinate. Despite only light winds over the past year and the fact that the turbines were not often continuously available due to scheduled measuring activities in the first twelve months the N131/3300 produced more than nine GWh of clean electricity against the backdrop of an average wind speed of 6.1 m/s.

With its overall height of almost 230 metres the turbine is able to make use of the higher-yield layers of air where there is less turbulence, which significantly increases the annual power output. The volume of electricity generated proves that, especially for sites in regions with low average speeds, powerful turbines with a... ... More: Official Press Release Nordex

Keywords:
turbine, yield, performance, Nordex, onshore







Thematically suitable Windfair.net members in the business directory

  • Newlist_pce-instruments-logo-300dpi
  • Newlist_logo.windfair-us
  • Newlist_logo.drakawind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024