2024-12-27
https://w3.windfair.us/wind-energy/news/24178-land-cable-connections-for-the-east-anglia-one-offshore-wind-farm

Land cable connection for the East Anglia ONE offshore wind farm goes to Prysmian

Prysmian UK will install the cables leading from the East Anglia ONE offshore Wind Farm to the British shore.

Official Press Release Prysmian:

Land cable connections for the East Anglia One offshore wind farm

Wind Industry Profile of
Land cable connections for the East Anglia One offshore wind farm

Prysmian UK to develop the land cable connections for the East Anglia ONE offshore wind farm / A 220 kV underground cable will link 102 turbines to the grid to power 500,000 homes / “We are proud to be involved in a world-leading project of this significance for the UK renewable energy sector, says Llyr Roberts, Prysmian UK CEO

Prysmian Group, world leader in the energy and telecom cable systems industry, has secured a £ 27million contract with East Anglia One Limitedto supply and install the land cable connection for the East Anglia ONE offshore wind farm.  Comprising of 102 turbines, the £2.5 billion wind farm will generate sufficient electricity to power 500,000 homes. The contract involves the supply and installation of a 220kV double circuit from... ... More: Official Press Release Prysmian

Keywords:
Prysmian, offshore, cables







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024