2024-12-23
https://w3.windfair.us/wind-energy/news/14989-first-foundation-installed-at-dong-energy-s-westermost-rough-offshore-wind-farm

First foundation installed at DONG Energy’s Westermost Rough offshore wind farm

The first of 35 foundations has been installed at Westermost Rough on 25th February 2014, marking the beginning of offshore construction at the wind farm.

Source:
Dong Energy
Link:
www.dongenergy.co.uk/...







Keyword Search

© smart dolphin Gmbh 1999 - 2024