10/21/2009
Azerbaijan - Investors of country’s first wind power plant demand governmental grants for consumers
Projects of wind power plants in Baku suburbs were presented at yesterday’s conference “Renewable Energy: International Best Practice & Prospects for the Development in Azerbaijan” organized by OSCE.
German companies Vestas Alpha New Tecnology Services GmbH, Mitaki GmbH and AirWerk GmbH are ready to become equipment suppliers for these ends and commission the first wind power plant in Azerbaijan already in 2010 or 2011.
But the problem is only in too high cost of electric power generated in such a way for Azerbaijan. This cost exceeds the tariff (0.06 manats) the country applies for electricity by 0.04-0.05 manats. In this connection the suppliers offer to introduce governmental grants and any other stimulus for power consumers.
For more information please contact Trevor Sievert at ts@windfair.net
German companies Vestas Alpha New Tecnology Services GmbH, Mitaki GmbH and AirWerk GmbH are ready to become equipment suppliers for these ends and commission the first wind power plant in Azerbaijan already in 2010 or 2011.
But the problem is only in too high cost of electric power generated in such a way for Azerbaijan. This cost exceeds the tariff (0.06 manats) the country applies for electricity by 0.04-0.05 manats. In this connection the suppliers offer to introduce governmental grants and any other stimulus for power consumers.
For more information please contact Trevor Sievert at ts@windfair.net
- Source:
- Online editorial www.windfair.net
- Author:
- Posted by: Trevor Sievert, Online Editorial Journalist
- Email:
- ts@windfair.net
- Link:
- www.windfair.net/...
- Keywords:
- wind energy, renewable energy, wind turbine, wind power, wind farm, rotorblade, onshore, offshore, Principle Power