2024-11-22
http://w3.windfair.us/wind-energy/news/44792-braun-windturbinen-north-small-wind-mast-load-installation-wind-turbine-antaris-germany-repeller

Further Antaris turbine installed in northern Germany

In Northern Germany, another Antaris small wind turbine from BRAUN Windturbinen will provide low-cost electricity in the future.

Official Press Release BRAUN Windturbinen:

And on we go in northern Germany!

Wind Industry Profile of
And on we go in northern Germany!

Here the Antaris 5.5 kW with the larger repeller D4.40m, installed on a 7.0m mast.

The wind turbine works 3-phase parallel to the grid with the TRIO 5.8 from FIMER: https://www.braun-windturbinen.com/.../wind-wechselrichter/ Wind monitoring is carried out via PLC (installed in the control cabinet), as well as with a small wind sensor which is installed on the mast via a bracket. The braking resistor (6.0 kW) together with the helicopter function controls the overload in gusts. 36kWh / day directly after commissioning, congratulations! If you have any questions... ... More: Official Press Release BRAUN Windturbinen

Keywords:
Braun Windturbinen, north, small wind, mast, load, installation, wind turbine, Antaris, Germany, repeller







Thematically suitable Windfair.net members in the business directory

  • Newlist_braun_windturbinen_logo
  • Newlist_windhunter_service_2_
  • Newlist_logo_idaswind
  • Newlist_logo.mesalands
  • Newlist_ge_vernova_standard_rgb_evergreen
  • Newlist_windrad_logo-1-rgb
  • Newlist_peikko_logo
  • Newlist_logo.mts
  • Newlist_cga_logo
  • Newlist_xervon_engl_logo
  • Newlist_rts_wind_ag_logo_652x312px
  • Newlist_hailo_wind_systems_logo_alternativ_grau
  • Newlist_geonet_logo
  • Newlist_pavana_logo_rgb_pfade_
  • Newlist_dynamica_ropes_logo_600x200
  • Newlist_minimax_logo
  • Newlist_windconsult-logo
  • Newlist_logo.pes
  • Newlist_sabowind_logo
  • Newlist_logo.deublin
  • Newlist_woelfel_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024