06/30/2023
Posted by:
Small wind pilot project at Telekom sites
Official Press Release BRAUN Windturbinen:
The Antaris is a guest at the Telekom!
The Antaris 7.5 kW works here with the Smart!wind SW7.5 (off-grid) on a 24m mast.
It is a 3-phase (400V AC) hybrid system consisting of solar, wind and a diesel generator as backup. In addition to the battery storage, 3 Sunny Islands from SMA are installed. https://www.braun-windturbinen.com/.../wind-wechselrichter/ The power supply for the mobile phone mast is provided by the above-mentioned components and serves as a pilot project for future Telekom sites. If you have any questions about the project, please contact us, we will be happy to advise... ... More: Official Press Release BRAUN Windturbinen
- Keywords:
- Braun Windturbinen, small wind, turbine, Antaris, Telekom, pilot project, component