2024-12-22
https://w3.windfair.us/wind-energy/news/44625-braun-windturbinen-small-wind-turbine-antaris-telekom-pilot-project-component

Small wind pilot project at Telekom sites

An Antaris 7.5 kW small wind turbine by Braun Windturbinen has been installed as a pilot project for the Telekom in Germany.

Official Press Release BRAUN Windturbinen:

The Antaris is a guest at the Telekom!

Wind Industry Profile of
The Antaris is a guest at the Telekom!

The Antaris 7.5 kW works here with the Smart!wind SW7.5 (off-grid) on a 24m mast.

It is a 3-phase (400V AC) hybrid system consisting of solar, wind and a diesel generator as backup. In addition to the battery storage, 3 Sunny Islands from SMA are installed. https://www.braun-windturbinen.com/.../wind-wechselrichter/ The power supply for the mobile phone mast is provided by the above-mentioned components and serves as a pilot project for future Telekom sites. If you have any questions about the project, please contact us, we will be happy to advise... ... More: Official Press Release BRAUN Windturbinen

Keywords:
Braun Windturbinen, small wind, turbine, Antaris, Telekom, pilot project, component







Thematically suitable Windfair.net members in the business directory

  • Newlist_pce-instruments-logo-300dpi
  • Newlist_logo.windfair-us
  • Newlist_logo.drakawind
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024