2024-12-22
https://w3.windfair.us/wind-energy/news/44203-equinor-trollvind-hold-development-indefinitely-challenge-project-technology-availability-rising-costs-strained-timetable-offshore-norway

Equinor stops Trollvind project

Equinor will postpone a further development of the Trollvind offshore wind initiative indefinitely as the project faces major hurdles.

Official Press Release Equinor:

Equinor put Trollvind on hold

Wind Industry Profile of
Equinor put Trollvind on hold

Equinor will postpone a further development of the Trollvind offshore wind initiative indefinitely. This decision is based on several challenges facing the project, including technology availability, rising cost and a strained timetable to deliver on the original concept. The authorities have been informed about the decision.

Equinor has previously announced reduced activity in the project due to technical, regulatory, and commercial challenges to the project. "We appreciate all the positive response towards Trollvind from politicians, suppliers, and authorities. Trollvind was a bold industrial plan to solve pressing issues concerning electrification of oil and gas installations, bringing much needed power to the Bergen-area, while accelerating floating offshore... ... More: Official Press Release Equinor

Keywords:
Equinor, Trollvind, hold, development, indefinitely, challenge, project, technology availability, rising, costs, strained timetable, offshore, Norway







Related News

Thematically suitable Windfair.net members in the business directory


more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024