2024-03-28
http://w3.windfair.us/wind-energy/news/43934-dnv-farms-wind-farm-earthquake-challenge-jip-industry-design-process-geotechnical-offshore-onshore-conditions-asia

DNV: Tackling earthquake challenges for wind farms

Image: PixabayImage: Pixabay
DNV has started a new Joint Industry Project (JIP) to increase certainty in the design process for wind farms challenged by earthquakes.

Official Press Release DNV:

DNV launches New joint Industry Project to Tackle Earthquake Challenges for wind farms

Wind Industry Profile of
DNV launches New joint Industry Project to Tackle Earthquake Challenges for wind farms

DNV, the independent energy expert and assurance provider, has started a new Joint Industry Project (JIP) to increase certainty in the design process for wind farms challenged by earthquakes.

The so called ACE2 JIP is a follow-up project of “Alleviating Cyclone and Earthquake Challenges” (ACE) JIP and will deeply investigate issues related to earthquakes which was not conducted in the first project. Special topics that will be addressed in the ACE2 JIP are geotechnical aspects such as damping and liquefaction, jack-up installation vessels, details of seismic load analysis and specific Taiwanese and Japanese needs. The results will be used to update the recommended practice ... More: Official Press Release DNV

Keywords:
DNV, FARMS, wind farm, earthquake, challenge, JIP, industry, design process, geotechnical, offshore, onshore, conditions, Asia







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.windfair-us
  • Newlist_logo.remchem
  • Newlist_logo.drakawind
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024