2024-12-22
https://w3.windfair.us/wind-energy/news/43561-havram-orsted-hornsea-3-uk-wind-farm-offshore-instalaltion-wind-turbine-jack-up-vessel-crane-wtiv-yorkshire

Ørsted selects Havram for installation work at Hornsea 3

The offshore wind farm Hornsea 3 will consist of up to 231 offshore wind turbines, located within a 696 square kilometer area, approximately 120 km off the Norfolk coast.

Official Press Release Havram:

Havfram Wind to install turbines at Ørsted's Hornsea 3 offshore wind farm

Ørsted, global offshore wind leader, has appointed Havfram Wind to install turbines at its Hornsea 3 offshore windfarm, starting autumn 2026. Havfram Wind will be utilizing one of its newly built NG20000X Jack-Up Wind Turbine Installation vessels (WTIV) with a 3.250-ton crane.

Hornsea 3 will consist of up to 231 offshore wind turbines, located within a 696 square kilometer area, approximately 120 km off the Norfolk coast and 160 km off the Yorkshire coast. With a capacity of 2,852 MW, Hornsea 3 will be capable of producing enough low-cost, clean, renewable electricity to power over 3 million UK homes. Patrick Harnett, Ørsteds Vice President for Execution Programmes, commented: "Delivering an offshore wind farm of the size and scale of Hornsea 3 requires... ... More: Official Press Release Havram

Keywords:
Havram, Ørsted, Hornsea 3, UK, wind farm, offshore, instalaltion, wind turbine, jack up, vessel, crane, WTIV, Yorkshire







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.windfair-us
  • Newlist_logo.drakawind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024