Posted by:
wpd windmanager takes over commercial and technical management of Hessian wind farm
Official Press Release wpd windmanager:
wpd windmanager expands cooperation with iTerra and Impax
Operations manager takes over management of Frielendorf Süd wind farm
iTerra and IMPAX are enhancing their cooperation with wpd windmanager. In the future, the operations manager will take over the commercial and technical management of the Frielendorf Süd wind farm. The project in the Hessian district of Schwalm-Eder is located at an altitude of around 230 meters above sea level and consists of two Vestas V150 turbines, each with a capacity of 4.2 MW and a hub height of 166 meters. The turbines will go into operation in the community of Frielendorf/Neuental at the end of February. iTerra and Impax are already working together with wpd windmanager with the same setup at the Häger/Sandruper See wind farm. For Impax, the operations manager has previously managed... ... More: Official Press Release wpd windmanager
- Keywords:
- wpd windmanager, cooperation, iTerra, Impax, management, wind farm, Hessia, Germany, district, commercial, technical, Frielendorf Süd