Posted by: Windfair Editors
GE’s Haliade-X 14.7MW-220 becomes largest wind turbine with a full type certification
Official Press Release GE Renewable Energy:
GE’s Haliade-X 14.7MW-220 turbine obtains full DNV type certificate
Rigorous third-party certification process for Haliade-X successfully completed / Haliade-X becomes the largest wind turbine with a full type certification / 14.7MW-220 builds on the Haliade-X platform that has been validated with extensive prototype tests completed since 2019
GE Renewable Energy announced today that its Haliade-X wind turbine, the first 12 MW+ turbine built, has received a full type certificate for operations up to 14.7 MW from DNV GL, the world’s largest independent certification body. This type certification, which follows an earlier certification that the Haliade-X could operate at up to 13.6 MW, provides independent verification that these turbines will operate safely, reliably and according to design specifications and makes the Haliade-X the most... ... More: Official Press Release GE Renewable Energy
- Keywords:
- GE Renewable Energy, Haliade-X, certification, type certification, MW, turbine, UK, offshore, wind farm, Dogger Bank