2024-12-22
https://w3.windfair.us/wind-energy/news/42575-parkwind-arcadis-ost-wind-farm-offshore-installation-wind-turbine-germany-baltic-sea-development-engineering-process-operation-crane

New floating installation method used at Arcadis Ost 1

Heerema, Vestas and Parkwind complete its first wind turbine installation in the German offshore wind farm.

Official Press Release Parkwind:

First wind turbine installed at Parkwind’s Arcadis Ost 1 wind farm

Wind Industry Profile of
First wind turbine installed at Parkwind’s Arcadis Ost 1 wind farm

Heerema, Vestas and Parkwind complete its first wind turbine installation using a revolutionary floating installation method

The first out of the 27 Vestas V174 – 9.5MW turbines has successfully been installed at the Arcadis Ost 1 wind farm. Using a unique floating installation method, Parkwind, together with Heerema Marine Contractors and Vestas, marks an industry premiere in wind turbine installation on commercial scale. The plan to use a floating installation method for Arcadis Ost 1 was announced for the first time in November 2019. Today, after almost 3 years of development and engineering, we have successfully executed the floating installation of the first Arcadis Ost 1 turbine. This innovative method has two main advantages. The first is zero seabed... ... More: Official Press Release Parkwind

Keywords:
Parkwind, Arcadis Ost, wind farm, offshore, installation, wind turbine, Germany, Baltic Sea, development, engineering, process, operation, crane







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind
  • Newlist_kaeufer_logo
  • Newlist_logo.remchem
  • Newlist_pce-instruments-logo-300dpi
  • Newlist_logo.windfair-us

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024