2024-03-29
http://w3.windfair.us/wind-energy/news/42538-ge-renewable-energy-mammoet-lifting-crane-dogger-bank-offshore-wind-far-onshore-able-seaton-port-blade-nacelle-tower

GE Renewable Energy selects Mammoet for Dogger Bank heavy lifting job

Image: MammoetImage: Mammoet
GE Renewable Energy announced today that it has selected Mammoet UK to supply onshore heavy lifting and transport for the staging and assembly of turbine components for the Dogger Bank Wind Farm.

Official Press Release GE Renewable Energy:

GE Renewable Energy selects Mammoet to supply onshore heavy lifting and transport for Dogger Bank Wind Farm

Wind Industry Profile of
GE Renewable Energy selects Mammoet to supply onshore heavy lifting and transport for Dogger Bank Wind Farm

Cranes will support staging of 277 sets of blades, nacelles, and towers at Able Seaton Port / Project will become largest offshore wind farm in world when complete

GE Renewable Energy announced today that it has selected Mammoet UK, based in Thornaby Teesside, to supply onshore heavy lifting and transport for the staging and assembly of turbine components for the Dogger Bank Wind Farm.  Dogger Bank Wind Farm is a joint venture between SSE Renewables, Equinor and Vårgrønn. Mammoet will employ multiple lifting and transport crews for simultaneous operations to support with the loading of equipment and tower assembly in the marshalling harbor, a key piece in constructing the project. The team will utilize cranes and self-propelled modular transporter... ... More: Official Press Release GE Renewable Energy

Keywords:
GE Renewable Energy, Mammoet, lifting, crane, Dogger Bank, offshore, wind far, onshore, Able Seaton Port, blade, nacelle, tower







Thematically suitable Windfair.net members in the business directory

  • Newlist_kaeufer_logo
  • Newlist_logo.drakawind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024