2024-04-26
http://w3.windfair.us/wind-energy/news/42314-van-oord-calypso-cale-laying-vessel-offshore-wind-industry-fleet-carousel-sustainability-construction

Calypso on its way to Norway

Image: Van OordImage: Van Oord
Van Oord’s new cable-laying vessel Calypso is on its way to the Vard Brattvaag yard in Norway for construction finishing

Official Press Release Van Oord:

Milestone: next phase for new cable-laying vessel Calypso

Wind Industry Profile of
Milestone: next phase for new cable-laying vessel Calypso

Van Oord’s new cable-laying vessel Calypso is on its way to the Vard Brattvaag yard in Norway for construction finishing, after a successful and safe launch at the Vard Tulcea shipyard in Romania, last week. This next-generation, custom-built vessel will be a key strategic addition to Van Oord’s offshore wind fleet, being equipped with the latest sustainable technologies. Construction is progressing well on schedule and the vessel is expected to be operational from the end of 2023 on.

The Calypso is Van Oord’s second cable-laying vessel in addition to the Nexus. It measures 131 metres in length and 28 metres across the beam and will be Dutch flagged. The new DP2 vessel will not only be fitted with a carousel on deck but also with a second, below-deck cable carousel, with... ... More: Official Press Release Van Oord

Keywords:
Van Oord, Calypso, cale laying vessel, offshore, wind industry, fleet, carousel, sustainability, construction







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.windfair-us
  • Newlist_logo.drakawind
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024