2024-12-22
https://w3.windfair.us/wind-energy/news/41637-seaway-7-moray-west-offshore-wind-farm-scotland-eic-wind-farm-inter-array-cables-mw-capacity

News Release from windfair.net

List_windfair_logo_pos

Wind Industry Profile of


Seaway 7 to start working on Moray West inter-array cables

The company will start early works on the Engineering, Procurement, Installation and Commissioning (EPIC) of inter-array grid cables for the Moray West offshore wind farm off the coast of Scotland.

The Moray West offshore wind farm development is located on the East coast of Scotland in the Moray firth, 22.5 km from the Caithness coastline. The project includes 60 wind turbines with an installed capacity of 882MW. 

Seaway 7’s scope is under final negotiation and may include the supply and installation of approximately 125 km of 66 kV subsea power cables and respective cable protection systems.? Work on the project is expected to start in 2024.

Source:
Seaway 7
Author:
Windfair Editors
Email:
press@windfair.net
Keywords:
Seaway 7, Moray West, offshore, wind farm, Scotland, EIC, wind farm, inter array, cables, MW, capacity



All news from windfair.net

List_windfair_logo_pos

news in archive


Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_prysmian_logo_rgb
  • Newlist_logo.overspeed
  • Newlist_anemos_logo_neu
  • Newlist_windrad_logo-1-rgb
  • Newlist_logo.weigt
  • Newlist_ts_logo_rgb
  • Newlist_eno_energy_ogo_claim
  • Newlist_logo.helukabel
  • Newlist_logo.engr.wisc
  • Newlist_geonet_logo
  • Newlist_bmu_logo
  • Newlist_logo.tuev-sued-offshore
  • Newlist_umweltbank_logo-2024-claim_mit-schutzzone
  • Newlist_dynamica_ropes_logo_600x200
  • Newlist_logo.labkotec
  • Newlist_logo.argentinaeolica.org
  • Newlist_rts_wind_ag_logo_652x312px
  • Newlist_juwi_logo_mit_verlauf_digital_srgb
  • Newlist_logo.teut
  • Newlist_roxtec-logo
  • Newlist_logo_idaswind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024