Posted by: Windfair Editors
First French-build CTV launched
Official Press Release Louis Dreyfus Armateurs:
Saint-Nazaire offshore wind farm: Launch of the first CTV designed and built in France
At a time when EDF Renewables and GE Renewable Energy have announced the installation of the first offshore wind turbines on the Saint-Nazaire offshore wind farm, Louis Dreyfus Armateurs and Tidal Transit are pleased to announce the launch of the first Crew Transfer Vessel (CTV) dedicated to the operations and maintenance of the wind farm.
On Thursday, April 28, 2022, the launch of the vessel was attended by representatives of the French shipyard OCEA, GE Renewable Energy, EDF Renouvelables and Louis Dreyfus Armateurs. As a reminder, in December 2020, GE Renewable Energy (GE) selected Louis Dreyfus Armateurs and Tidal Transit for two CTVs for the Saint-Nazaire offshore wind farm. Construction of the two CTVs began in 2021 for a planned commissioning in summer... ... More: Official Press Release Louis Dreyfus Armateurs
- Keywords:
- France, Saint Nazaire, wind farm, offshore, vessel, CTV, crew transfer vessel, Louis Dreyfus Armateurs, Tidal Transit