Posted by: Windfair Editors
Vestas wins turbine order from the U.S.
Official Press Release Vestas:
Vestas secures 171 MW order from Cordelio Power in the USA
Vestas has received a 171 MW order from Cordelio Power to power the Moraine Sands wind project in Illinois, USA. The order consists of 38 V150-4.5 MW turbines. This project is an expansion of the 185 MW Glacier Sands wind farm, commissioned in November 2021, which consists of 43 V150-4.2 MW turbines delivered in 4.3 operating mode.
“Building off the successful commissioning and operations of the Glacier Sands wind farm, Vestas is thrilled to partner once again with Cordelio on the Moraine Sands wind project to collaboratively expand Illinois’ renewable energy footprint,” said Laura Beane, President of Vestas North America. Cordelio’s CEO John Carson stated, “We offer our thanks to the Vestas team, who have played an important role in our... ... More: Official Press Release Vestas
- Keywords:
- Vestas, USA, wind farm, onshore, Cordelio Power, Moraine Sands, Illinois, turbine, delivery