2024-12-22
https://w3.windfair.us/wind-energy/news/40037-prysmian-interconnector-uk-germany-cotract-renewable-energy-neuconnect-energy-market-efficiency-submarine-cables-link-grid-europe

Prysmian secures order for first UK-Germany interconnector

The project shall deliver the cable connection along a route which runs between the UK converter station located on the Isle of Grain in Kent (UK), passing through UK, Dutch and German waters to the landing point in Lower Saxony in Germany to connect with the converter station near Wilhelmshaven.

Official Press Release Prysmian Group:

Prysmian to deiver the first Interconnector between UK and Germany

Wind Industry Profile of
Prysmian to deiver the first Interconnector between UK and Germany

Major contract worth around €1.2 billion awarded by NeuConnect / Cable transmission link vital to imprioving the integration and efficiency of European renewable resources

Prysmian Group, world leader in the energy and telecom cable systems industry, has been awarded a contract worth around €1.2 billion by NeuConnect Britain Limited and NeuConnect Deutschland GmbH for the turn-key design, manufacturing, installation, testing and commissioning of a 725 kilometer submarine interconnector that will directly link the German and UK electricity grids for the first time. This 1400 MW submarine and land cable system will connect two of Europe’s largest energy markets, promoting the efficient use and integration of renewable energy generation resources in both Germany and... ... More: Official Press Release Prysmian Group

Keywords:
Prysmian, interconnector, UK, Germany, cotract, renewable energy, NeuConnect, energy market, efficiency, submarine, cables, link, grid, Europe







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind
  • Newlist_kaeufer_logo
  • Newlist_logo.windfair-us

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024