2024-12-23
https://w3.windfair.us/wind-energy/news/38083-vestas-orsted-onshore-turbine-wind-farm-collaboration-ireland-lisheen-3-tipperary-location

Vestas and Ørsted cooperate in Ireland

Ørsted orders the supply, installation, and servicing of eight V136-3.45 MW turbines in 3.6 MW operating mode.

Official Press Release Vestas:

Vestas receives 29 MW order in Ireland to mark first onshore collaboration in Europe with Ørsted

Wind Industry Profile of
Vestas receives 29 MW order in Ireland to mark first onshore collaboration in Europe with Ørsted

Vestas has secured a 29 MW order from Ørsted for the Lisheen 3 project in County Tipperary, Ireland.

The order comprises the supply, installation, and servicing of eight V136-3.45 MW turbines in 3.6 MW operating mode. It will be the third phase of Vestas-supplied wind parks at the project location, following the 36 MW Lisheen and the 24 MW Lisheen extension projects. The turbines will be serviced by Vestas through a long-term 20-year Active Output Management 5000 (AOM 5000) service agreement, providing power performance certainty and Vestas’ industry-leading service expertise throughout the lifetime of the project. The order marks the first onshore wind project for which Vestas will supply turbines to Ørsted, in Ireland and in... ... More: Official Press Release Vestas

Keywords:
Vestas, Ørsted, onshore, turbine, wind farm, collaboration, Ireland, Lisheen 3, Tipperary, location







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_peikko_logo
  • Newlist_ge_vernova_standard_rgb_evergreen
  • Newlist_windrad_logo-1-rgb
  • Newlist_eno_energy_ogo_claim
  • Newlist_logo.mesalands
  • Newlist_anemos_logo_neu
  • Newlist_logo_trans
  • Newlist_prysmian_logo_rgb
  • Newlist_logo.engr.wisc
  • Newlist_logo_idaswind
  • Newlist_xervon_engl_logo
  • Newlist_logo.overspeed
  • Newlist_logo.labkotec
  • Newlist_schaeffler_logo
  • Newlist_rts_wind_ag_logo_652x312px
  • Newlist_bwts_logo_2021
  • Newlist_reyher
  • Newlist_minimax_logo
  • Newlist_cga_logo
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024