2024-03-29
http://w3.windfair.us/wind-energy/news/38002-danish-energy-agency-offshore-wind-farm-tender-clay-formation-soft-seabed-preliminary-site-investigation-hesselo-denmark

Tender for Danish Hesselø OFW stopped

Image: PixabayImage: Pixabay
The tender for Hesselø OFW has been put on hold until the results of the preliminary site investigations have been further analysed, the Danish Energy Agency said.

Official Press Release Danish Energy Agency:

The tender for Hesselø OFW has been put on hold

There is a need to analyze the results of the preliminary site investigation further as soft clay formations have been found in the upper 20-30 meters below the seabed.

The tender for Hesselø OFW has been put on hold until the results of the preliminary site investigations have been further analysed. This decision is due to the preliminary site investigations having revealed soft clay formations, especially the upper 20-30 m below the seabed, in large parts of the area selected for the OFW (please see the map below). The results appear to indicate less favourable site conditions than initially specified in the fine screening report, which may cause technical challenges in relation to installation. Currently, external consultants are conducting further... ... More: Official Press Release Danish Energy Agency

Keywords:
Danish Energy Agency, offshore, wind farm, tender, clay, formation, soft, seabed, preliminary, site investigation, Hesselø, Denmark







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.weigt
  • Newlist_logo.tuev-sued-offshore
  • Newlist_anemos_logo_neu
  • Newlist_ts_logo_rgb
  • Newlist_logo.overspeed
  • Newlist_geonet_logo
  • Newlist_logo.engr.wisc
  • Newlist_windrad_logo-1-rgb
  • Newlist_bmu_logo
  • Newlist_logo.hodijcoatings
  • Newlist_fin_logo_pne_rgb
  • Newlist_pavana_logo_rgb_pfade_
  • Newlist_ge_renewable_energy_blau
  • Newlist_dynamica_ropes_logo_600x200
  • Newlist_logo.enervest
  • Newlist_logo_web_inkl_neuer_url_web.energy
  • Newlist_iea_logo_new
  • Newlist_irena_logo
  • Newlist_prysmian_group_logo
  • Newlist_eno_energy_ogo_claim
  • Newlist_elpress_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024