2024-12-22
https://w3.windfair.us/wind-energy/news/37289-ingeteam-wind-controller-firmware-development-methodology-drivetrain-technology-firmware-methodology-wind-turbine-wind-farm-field-validation-power-converter

Ingeteam Introduces New Firmware Development Methodology

The firmware program within the converter controls and ensures the correct electrical behavior and safe operation of the electrical grid, which is why its behavior must be rigorously tried and tested prior to installation.

Official Press Release Ingeteam:

Ingeteam introduces a new robust wind controller firmware development methodology

Wind Industry Profile of
Ingeteam introduces a new robust wind controller firmware development methodology

Ingeteam, the global specialist in wind energy drivetrain technology, announces that its firmware development methodology has been shown to significantly reduce the critical on-site validation and certification phase thanks to its robust qualification process. This speeds up the time to market and commercial production capacity of new wind farm developments whilst ensuring the highest level of reliability in the field.

Securing the transmission capacity and interconnectivity of new wind turbines to the grid is a crucial moment during the installation of any new wind farm. This critical phase often involves up to six months of field tests to ensure that all the elements are working properly before the wind farm achieves full certification. At the heart of this process is the ... More: Official Press Release Ingeteam

Keywords:
Ingeteam, wind controller firmware development methodology, drivetrain technology, firmware, methodology, wind turbine, wind farm, field, validation, power converter







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.windfair-us
  • Newlist_kaeufer_logo
  • Newlist_logo.drakawind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024