News Release from windfair.net
Wind Industry Profile of
Triton Knoll OWF: All Wired In
NKT finalized the manufacturing and delivery of both the export cable system and array cables for the Triton Knoll offshore wind farm located in the North Sea east of Lincolnshire in the UK, the company announced. The project comprises the manufacture of 100 km of 220 kV HVAC offshore export cables and 144 km of 66 kV array cables which were manufactured at NKT’s high-voltage power cable factory in Cologne, Germany, and included the installation off the British coast.
"Offshore wind is a cornerstone in mitigating climate change and we are proud to continue our long-term collaboration with RWE and its partners J-Power and Kansai Electronic Power to drive the green transition of the UK. The successful collaboration has been essential to our supply of both export- and array cables for Triton Knoll during the challenging times of COVID-19. With the finalization of the project, we continue to set our mark on the ongoing development of offshore wind as a leading power cable provider," Alexander Kara, President & CEO in NKT, said.
When in full operation the 90 turbines installed will be able to provide renewable energy for more than 800,000 households annually. As RWE reported on Monday, first turbines have started generating power.
- Source:
- NKT
- Author:
- Windfair Editors
- Email:
- press@windfair.net
- Keywords:
- Triton Knoll, NKT, cables, RWE, offshore, wind farm, array cable, export cable, UK, power, household, manufacturig