2024-04-19
http://w3.windfair.us/wind-energy/news/36008-m-pt-bolting-system-wind-turbine-wind-industry-service-repair-installation-customer-experience-rad-torque-systems-torque-bolt

News Release from M-PT Matjeschk-PowerTools GmbH & Co. KG

List_mpt_logo

Wind Industry Profile of


M-PT: Bolting Systems and Service for the Wind Industry

We support companies with the planning, installation and maintenance of wind turbines. The quality management requirements of our customers and our practical daily experience of assembly work form the basis of research and development at M-PT. The internationally renowned manufacturer RAD Torque Systems has authorized M-PT to be the sole German sales and service partner for its products.

Assembly of blade adapter with MED 34-90 (Image: M-PT)Assembly of blade adapter with MED 34-90 (Image: M-PT)

Protecting bolted connections

If bolts are turned further during maintenance, this impacts on the bolted connection. We have therefore developed an innovative battery-powered torque wrench MAD and electric torque wrench MED with an integrated, highly sensitive test program. Unlike conventional devices, these torque wrenches measure the

torque on the bolt as tension builds, without actually tightening the bolt further. The result: the bolted connection is not manipulated during maintenance.

Innovation for precise torque

Torsion and friction in the gearbox of a torque wrench determine the torque during assembly. In order to avoid these impacts, our partner RAD Torque Systems has developed an internationally unique socket with integrated torque sensor, the SMART SOCKET. It measures the torque transferred to the bolt directly at the bolted connection. For optimal torque accuracy the torque wrenches of the series E-RAD BLU are especially suitable.

Image right: Assembly of tower flange with E-RAD BLU 8000 and SMART SOCKET (Source: M-PT)

Advantages of battery-powered and electric torque wrenches

Battery-powered and electric torque wrenches are particularly suitable for working on wind turbines. They are simple and speed up assembly by continuously applying torque. Compared with other torque systems such as hydraulic wrenches, the assembly time, and therefore crane time, is reduced by up to 60 percent.

We offer:

Sales and rental, as well as repairs and calibration.

Source:
M-PT
Author:
Press Office
Link:
www.m-pt.de/...
Keywords:
M-PT, bolting system, wind turbine, wind industry, service, repair, installation, customer, experience, RAD Torque Systems, torque, bolt



Alle Meldungen Von M-PT Matjeschk-PowerTools GmbH & Co. KG


Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind
  • Newlist_logo.windfair-us
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024