Posted by:
Turbine Installation Kicks off at SeaMade in Belgium
Official Press Release DEME Offshore:
Turbine installation kicked off at SeaMade, Belgium’s largest offshore wind farm
First turbine installed last Saturday
DEME Offshore has installed the first turbine at the SeaMade offshore wind farm in the Belgian North Sea. With a 487 MW capacity, SeaMade is the largest offshore wind farm in Belgium. Offshore construction of the SeaMade wind farm started in September 2019, with the last foundation installed in January 2020 and in the meantime connected by the subsea cables. DEME’s DP2 offshore installation vessel ‘Apollo’ will now install 58 Siemens Gamesa 8.4 MW turbines on the monopile foundations. ‘Apollo’ loaded the first wind turbine components at the Renewable Energy Base Ostend (REBO), which is used as the marshalling harbour for the pre-assembly of the 58 turbines. From Ostend, ‘Apollo’... ... More: Official Press Release DEME Offshore
- Keywords:
- DEME, offshore, installation, wind farm, substation, Belgium, North Sea, SeaMade, North Sea, Apollo, Siemens Gamesa