2024-12-22
https://w3.windfair.us/wind-energy/news/34801-owa-carbon-trust-offshore-wind-turbine-boat-landing-geometry-design-ctv-wind-farm-fender-research-development-costs

Carbon Trust's OWA Publishes New Recommended Boat Landing Geometry Design

It was developed by the Offshore Wind Accelerator (OWA), a collaborative research, development and deployment programme between the Carbon Trust and nine offshore wind developers.

Official Press Release Offshore Wind Accelerator (OWA) / Carbon Trust:

Offshore wind projects to benefit from new recommended boat landing geometry design

Wind Industry Profile of
Offshore wind projects to benefit from new recommended boat landing geometry design

Offshore Wind Accelerator publishes new recommended boat landing geometry design.

A new publicly available design of recommended boat landing geometry has been released today for use by offshore wind developers and Crew Transfer Vessel (CTV) owners and operators. The design offers a consistent fender geometry for use on CTVs across different wind farms, reducing the time and cost of changing fenders. It was developed by the Offshore Wind Accelerator (OWA), a collaborative research, development and deployment programme between the Carbon Trust and nine offshore wind developers. The new design follows analysis of the interaction and impact of CTVs on boat landings... ... More: Official Press Release Offshore Wind Accelerator (OWA) / Carbon Trust

Keywords:
OWA, Carbon Trust, offshore, wind turbine, boat landing, geometry, design, CTV, wind farm, fender, research, development, costs







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.windfair-us
  • Newlist_logo.drakawind
  • Newlist_pce-instruments-logo-300dpi
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024