2024-11-05
http://w3.windfair.us/wind-energy/news/34109-fairwind-order-transition-piece-customer-bladt-industries-borssele-hornsea-offshore-wind-farm-foundation-turbine

News Release from windfair.net

List_windfair_logo_pos

Wind Industry Profile of


FairWind Completed Largest Electrical and High Voltage Project in Company History

Wind industry solutions provider FairWind has completed an order for 59 transition pieces for their customer Bladt Industries.

The transition pieces were assembled in the Danish town of Aalborg and will be installed at Dutch offshore wind farm Borssele 1+2.

The project scope included full electrical installation – including mounting circuit breakers, lights, cabling, filling high voltage switchgear with liquid air, and all other electrical components, making it the largest electrical/high voltage project FairWind had ever conducted.

The next project is already looming at the horizon, as FairWind will build 135 transition pieces for the Hornsea 2 offshore wind farm in the UK. This marks another order from Bladt Industries.

Source:
FairWind
Author:
Windfair Editors
Email:
press@windfair.net
Keywords:
FairWind, order, transition piece, customer, Bladt Industries, Borssele, Hornsea, offshore, wind farm, foundation, turbine



All news from windfair.net

List_windfair_logo_pos

news in archive


Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.windfair-us

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024