News Release from windfair.net
Wind Industry Profile of
03/02/2020
Goldwind's First Argentinian Wind Farm Reaches Commercial Operation
Goldwind had acquired the designated wind farm sites Loma Blanca and Miramar projects in Argentina before and has now constructed the 347.65 MW wind farm.
Loma Blanca is located in the Chubut province, and is known to be among the largest wind farm clusters within the country. It consists of four separate wind farms that total 250MW, namely Loma Blanca I, II, III & VI. The Miramar project, sited in the vicinity of Buenos Aires, has a capacity of 97.65 MW.
- Source:
- Goldwind
- Author:
- Windfair Staff
- Email:
- press@windfair.net
- Keywords:
- Goldwind, Argentia, wind farm, cluster, South America, turbine, construction, operation