2024-12-22
https://w3.windfair.us/wind-energy/news/33791-first-subsea-uk-scotland-nng-offshore-wind-farm-deme-neart-na-gaoithe-turbine-cable-protection-subsea-marine

Cable Protection Systems for Neart na Gaoithe Provided by First Subsea

First Subsea has been awarded a contract by DEME Offshore for the Cable Protection System for the inter-array cables at the Neart na Gaoithe offshore wind farm.

Official Press Release First Subsea:

First Subsea provides Cable Protection Systems for NnG

Wind Industry Profile of
First Subsea provides Cable Protection Systems for NnG

First Subsea, part of the First Tech Group based in Aberdeen has been awarded a major contract by DEME Offshore for the Cable Protection System for the inter-array cables at the Neart na Gaoithe offshore wind farm. The windf arm has been developed by EDF Renewables and Irish electricity company ESB, which now has a 50% stake in the project.

Neart na Gaoithe will consist of 54 turbines and will be located in the North Sea approximately, 15km off the coast of Fife in south-east Scotland. When fully operational, the NnG offshore wind farm will generate 450 MW the equivalent electricity to power over 375,000 households each year, which corresponds to 4% of Scotland’s electricity consumption. The cable protection system will be designed to protect the cable during... ... More: Official Press Release First Subsea

Keywords:
First Subsea, UK, Scotland, NnG, offshore, wind farm, DEME, Neart na Gaoithe, turbine, cable protection, subsea, marine







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind
  • Newlist_logo.windfair-us
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024