2024-04-23
http://w3.windfair.us/wind-energy/news/33152-nexans-cable-offshore-wind-france-wind-farm-connecting-grid-inspection-imr-submarine-export-cable

Nexans to Connect French Saint Brieuc Offshore Wind Farm

Image: NexansImage: Nexans
RTE France has awarded a € 115 million contract to Nexans to supply and install the 67km offshore and 93km onshore power export cables for the 496 MW Saint Brieuc offshore wind farm, located in the English Channel

Official Press Release Nexans:

Nexans contributes to France’s energy transition by connecting Saint Brieuc offshore wind farm

Wind Industry Profile of
Nexans contributes to France’s energy transition by connecting Saint Brieuc offshore wind farm

Nexans will provide the 225 kV power export cables for Saint Brieuc, one of the biggest offshore wind projects in France / In the framework of the 115-million-euro contract, Nexans will deliver cables featuring innovative hybrid armouring / Nexans will also provide Inspection, Maintenance and Repair (IMR) services for the project

RTE France has awarded a € 115 million contract to Nexans to supply and install the 67km offshore and 93km onshore power export cables for the 496 MW Saint Brieuc offshore wind farm. Located in the English Channel, some 16 km off the coast of Saint Brieuc Bay, the wind farm is expected to generate enough power to meet the daily electricity needs of more than 835,000 homes.  The project is being developed by the Ailes Marines... ... More: Official Press Release Nexans

Keywords:
Nexans, cable, offshore, wind, France, wind farm, connecting, grid, inspection, IMR, submarine, export cable







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind
  • Newlist_kaeufer_logo
  • Newlist_logo.windfair-us

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024