2024-12-22
https://w3.windfair.us/wind-energy/news/32697-nkt-dogger-bank-uk-offshore-wind-farm-cables-submarine-high-voltage-dc-creyke-beck-a-b-export-cable-installation-equinor-sse

NKT Wins Dogger Bank Order

NKT is preferred turnkey supplier for Creyke Beck A/B, a part of the planned Dogger Bank Offshore Wind Farms

Official Press Release NKT:

NKT is preferred turnkey supplier for Dogger Bank offshore Wind Farms Creyke Beck A/B

Wind Industry Profile of
NKT is preferred turnkey supplier for Dogger Bank offshore Wind Farms Creyke Beck A/B

NKT has entered a Preferred Supplier Agreement (PSA) as main contractor for delivery and installation of high-voltage DC on- and offshore export cable systems to the prospective Dogger Bank offshore Wind Farms Creyke Beck A/B. The project is being developed as a joint venture by Equinor (50%) and SSE (50%).

Dogger Bank Wind Farms Creyke Beck A/B was notified today that it was successful in the UK allocation of Contracts for Difference (CfD), which is a key step towards a final order. Such confirmed order is now conditional upon final contract negotiations and that the project owners provide NKT a notice to proceed. Furthermore, NKT notices that the outcome of the judicial review, which has been lodged against the CfD auction process, is currently unknown. The NKT... ... More: Official Press Release NKT

Keywords:
NKT, Dogger Bank, UK, offshore, wind farm, cables, submarine, high-voltage, DC, Creyke Beck A/B, export cable, installation, Equinor, SSE







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind
  • Newlist_logo.windfair-us
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024